|
CIVIL ENGINEERING AND CONSTRUCTION WORK
| Pipeline site Construction |
| Client: |
Saipem |
| Contract |
Aire De Stockage II |
| Location: |
Across Tunisia from Feriana
(Algerian border) to Haouaria (Tunisian North Coast) |
| Date: |
1991 to 1992 |
| Scope Of Services: |
Site Construction including
the preparation of 37 pipe storage areas approximately
450,000 m2, the transportation and handling of all 48"
diameter pipe, and Logistic Support. |
| Description Of
Services: |
Construction Of Pipe Storage
Areas
Transport And Handling Of Casing and Tubing |
| Attestation: |
Recommandation
Letter |
|
 |
|
Top 
| Civil works for pipe-line construction |
| Client: |
Saipem |
| Contract |
Master Civil Works Contract |
| Location: |
Across Tunisia from Feriana
(Algerian border) to Haouaria (Tunisian North Coast) |
| Date: |
1991 to 1992 |
| Scope Of Services: |
The project consisted of the
construction of 15 sluice gates, two terminals and two
shut down stations. |
| Description Of
Services: |
Mobilisation, removal and
demobilisation of site camps
Topographic surveys
Excavation & backfill for installation of pipelines
and electric cables
Construction of camp sites
Construction of access roads
Installation of fencing
Construction of sewage systems
As built documentation |
| Attestation: |
Recommandation
Letter |
|
 |
|
Top 
| Construction of land drilling site and access roads |
| Client: |
Pioneer |
| Contract |
Civil Works |
| Location: |
Jorf South West Tunisia |
| Date: |
10/2002 to 02/2003 |
| Scope Of Services: |
Civil works, Site construction,
Access roads, Water haulage |
| Description Of
Services: |
Maintenance of access road
during drilling operator, logistic & local purchasing
|
| Attestation: |
Recommandation
Letter |
|


|
|
Top 
|